← Dashboard
SCC & SAT RTU
SCC & SAT RTU
Please fill in the following details for RTU installation completion and testing.
Email
Name of Personnel Attending
Contract No.
-- select contract --
TNB765/2024
TNB766/2024
TNB767/2024
TNB768/2024
TNB769/2024
TNB770/2024
TNB771/2024
TNB772/2024
TNB773/2024
TNB131/2024
TNB130/2024
TNB685/2022
TNB692/2022
TNB2555/2023
Installation Date
SAT Date
Substation Name
Functional Location
State
-- Select State --
JOHOR
KEDAH
KELANTAN
MELAKA
NEGERI SEMBILAN
PAHANG
PERAK
PERLIS
PULAU PINANG
SELANGOR
TERENGGANU
W.P. KUALA LUMPUR
W.P. PUTRAJAYA
Sub Zone
VCB / RMU
-- Select --
VCB
RMU
RTU Panel Serial Number
Contractor Signature
-- Select personnel --
Nazrul
Razif (Aras)
Azrin
Hasfaruddin
Hasfaruddin (Aras)
Hasfaruddin (Hasilwan)
Shalahuddin
Tarmizi
Tarmizi Empty
Syahrul
Amirul Aiman
Site Drawing
Add:
EFI
Feeder
BC
RCB
RTU
DB
Door
Line
Box
Select:
☐ All
↻ Rotate
✕ Delete
🗑 Clear all
Ctrl+click to select multiple
Drawing Canvas
Drag to position · Double-click to rename · Long-press on mobile
SITE COMPLETION CHECKLIST
Before Installation
Overall Picture of Substation Outer Wall (With Substation Name)
📷 Camera
📁 Browse
Designated Space / Wall for RTU Before
📷 Camera
📁 Browse
After Installation
RTU After Installation
📷 Camera
📁 Browse
SITE ACCEPTANCE TEST
Overall Picture of Substation Outer Wall (With Substation Name)
📷 Camera
📁 Browse
RTU After Installation (With Inside Picture)
📷 Camera
📁 Browse
RTU Warranty sticker
📷 Camera
📁 Browse
Overall Picture Of Mastersheet inside RTU Panel
📷 Camera
📁 Browse
Cable Gland inside RTU Panel [max 2 pictures]
📷 Camera
📁 Browse
Individual Earthing Connections Completed for I/O Cables To RTU Earth Bar
📷 Camera
📁 Browse
Individual Earthing Connections Completed for I/O Cables To RTU Earth Stud at RCB Panel [max 3 pictures]
📷 Camera
📁 Browse
Installation Individual Earthing for SPD to RTU Earth Bar
📷 Camera
📁 Browse
Anti Static Wrist Strap Need to be Installed on ESP Bonding Points
📷 Camera
📁 Browse
Clear