SCC & SAT FTU
Please fill in the following details for FTU installation completion and testing.
Email
Name of Personnel Attending
Contract No.
-- select contract --
TNB765/2024
TNB766/2024
TNB767/2024
TNB768/2024
TNB769/2024
TNB770/2024
TNB771/2024
TNB772/2024
TNB773/2024
TNB131/2024
TNB130/2024
TNB685/2022
TNB692/2022
TNB2555/2023
Date
Substation Name
Functional Location
State
-- Select State --
JOHOR
KEDAH
KELANTAN
MELAKA
NEGERI SEMBILAN
PAHANG
PERAK
PERLIS
PULAU PINANG
SELANGOR
TERENGGANU
W.P. KUALA LUMPUR
W.P. PUTRAJAYA
Sub Zone
FTU Panel Serial Number
EFI Brand
-- Select --
EMG
NOTROLL
EFI 1 Serial Number
EFI 2 Serial Number
EFI 3 Serial Number
Contractor Signature
📁 Browse
Site Drawing
Add:
EFI
Feeder
BC
RCB
FTU
DB
Door
Line
Box
Select:
☐ All
↻ Rotate
✕ Delete
🗑 Clear all
Ctrl+click to select multiple
Drawing Canvas
Drag to position · Double-click to rename · Long-press on mobile
SITE COMPLETION CHECKLIST
Before Installation
Overall Picture of Substation Outer Wall (With Substation Name)
📷 Upload Photo
Designated Space / Wall for FTU Before Installation
📷 Upload Photo
Existing EFI(s) or Designated Space/Wall for EFI Installation [Max 2 Pictures]
📷 Upload Photo
After Installation
Overall Picture of Substation Outer Wall (With Substation Name)
📷 Upload Photo
FTU After Installation (With Inside Picture)
📷 Upload Photo
FTU Warranty Sticker
📷 Upload Photo
Overall Picture Of Mastersheet inside FTU Panel
📷 Upload Photo
EFI(s) (After Installation) [Max 4 Pictures]
📷 Upload Photo
Sample EFI'S CT Cable at Switchgear (After Clamped) [Max 2 Pictures]
📷 Upload Photo
Cables Gland Inside FTU Panel
📷 Upload Photo